- Electrical Equipment & Supplies
- Machinery
- Tools & Hardware
- Apparel
- Fashion Accessories
- Gifts & Crafts
- Luggage, Bags & Cases
- Sports & Entertainment
- Business Services
- Energy
- Fabrication Services
- Minerals & Metallurgy
- Electronic Components, Accessories & Telecommunications
- Packaging & Printing
- Vehicles & Accessories
- Beauty & Personal Care
- Food & Beverage
- Home & Garden
- Office & School Supplies
- Timepieces, Jewelry, Eyewear
- Chemicals
- Environment
- Health & Medical
- Rubber & Plastics
- Lights & Lighting
- Security & Protection
- Agriculture
- Consumer Electronics
- Furniture
- Home Appliances
- Shoes & Accessories
- Toys & Hobbies
- Construction & Real Estate
- Fabric & Textile Raw Material
- Home Textiles
- Service Equipment
- Vehicles New & Used
150X2-IN TAICANG
JIANGSU XI TEC ENVIRONMENTAL&DRILLING EQUIPMENT COMPANY CO.LTD
Visit the store
Settings:
XPB-90 high pressure pump, 6 cubic air compressor, cement mixing tank, one gas storage tank
Construction steps:
1. The construction site is arranged and levelled, and the pile positions are arranged and marked with sticks according to the drawings.
2. After the rig is in position, use a level to adjust the Angle of the rig's propulsion frame. If there is a high or low level, use the leg to adjust.
3, connect a drill rod and drill, open the air compressor, high pressure pump for pressure test.
4, after the completion of the pressure test, the drill pipe of the good point is drilled successively, and the drill is quickly drilled to the required depth, and then the rotary injection operation is carried out. Lifting speed 15cm/min Rotational speed 25r/min Cement slurry pressure 28MPa Air pressure 0.7MPa
5, pay attention to the regrouting situation, the drilling rig after lifting and spraying a drill pipe to remove the drill pipe and clean, prevent
Cement solidified in the drill pipe hole and blocked the drill pipe.
6. Lift to one meter above the ground to stop the shotcrete, pull out the drill pipe, and move the machine to the next pile site for construction.
7. Insert section steel at 45°
8, noon rest and night before work to clean the high pressure pump, drill pipe, high pressure pipe with water to prevent the stop time is too long cement slurry blocking the pipeline and drill pipe.
1 year ago
loading...
Instructions for using 150X2 model
JIANGSU XI TEC ENVIRONMENTAL&DRILLING EQUIPMENT COMPANY CO.LTD
0 views 1 month ago
8H300 all in one desktop computer
Guangdong Elieken Electronic Technology Co.,Ltd.
0 views 2 years ago
All Categories
- Electrical Equipment & Supplies
- Machinery
- Tools & Hardware
- Apparel
- Fashion Accessories
- Gifts & Crafts
- Luggage, Bags & Cases
- Sports & Entertainment
- Business Services
- Energy
- Fabrication Services
- Minerals & Metallurgy
- Electronic Components, Accessories & Telecommunications
- Packaging & Printing
- Vehicles & Accessories
- Beauty & Personal Care
- Food & Beverage
- Home & Garden
- Office & School Supplies
- Timepieces, Jewelry, Eyewear
- Chemicals
- Environment
- Health & Medical
- Rubber & Plastics
- Lights & Lighting
- Security & Protection
- Agriculture
- Consumer Electronics
- Furniture
- Home Appliances
- Shoes & Accessories
- Toys & Hobbies
- Construction & Real Estate
- Fabric & Textile Raw Material
- Home Textiles
- Service Equipment
- Vehicles New & Used